88

Key Information to be gathered during for the preliminary assessment:
- Details of each washer/sterilizer/tap that requires CSSD water feed water quality & type
- Volume of CSSD water quality type required per cycle per unit
- Number of cycles per hour and hours per day, per unit
- Draw rate of the equipment when filling per unit
- Future growth expansion (Design for allowance)
- Feed water quality (full analysis) and pressure to the plant room
- Ideal location – accessibility, power, water & drains
- Ring main temperature preference and heating method
- Existing ring main details and/or access for new ring main
- In-house capabilities (personnel/roles experience to maintain and operate)
- BMS and remote monitoring requirements
Doing the groundwork exercise to gather the required information, helps to ensure a successful and smooth implementation of the suitable water treatment solution for your CSSD.
Feel free to contact Tranzform Waters to learn more about the solutions we can offer.
